RECENT PROJECTS

JANUARY 2019

3 Strings Battery Installation. Installation of 3 strings DEKA UNIGY 11 Seal Gel Battery, 3AVR95-33, 1220 AH. Documented Terminal Voltage, Conductance and Temperature readings, 3 x 24 Cells. London, Ontario Canada.

 

august 2019

Installation and commission of two strings of VRLA Deka Unigy 11 Battery, which include 350 MCM cable/lugs, battery support, temperature sensors, and Midtronics conductance readings. Level 3 Communications - Toronto ON Canada. General contractor/Battery supplier, Eastpenn Canada.

 

March 2020

Removal of 3 wet cell strings, installation of two strings Deka Unigy 11 VRLA battery, and one string of GNB wet cell. Commission and document Modtronics readings. Windsor, ON Canada.

 

april 2020

Installation 1 string C&D wet cell. Recable battery string to power plant. Commission and document Midtronics readings. Oshawa ON Canada.